Getting there - slowly... Still got some leakage issues to resolve with the pump and compression fittings and a full 'wet run' (mustn't do a 'dry run' that'd kill the pump) to do. Planning to give my old kit it's last hurrah tomorrow while putting last touches on this and trying to resolve some of the issues through different routes.
Here's the silicon hose to move hot liquor and wort around, I've tried setting it all up initially to use brass hoselock connectors having picked up a few sets knocked down and make it all removable/disconnectable etc. However having a few issues with the male 3/4" tap connecotr bits with a little leaage - no worries when it's cold water at the moment but very different when it's hot wort. Concerns are integrity of the seals at temp and general watertightness, on first pump test with cold water had a few issues - nothing too bad and mainly on the pump outflow on first running. Will try adding PTFE and better tightening or if I can't resolve these at all then try pushing silicon hose over 15mm pipe with jubilee clip and then try hoselock connectors to join silsion pipe together rather than compression 15mm>3/4">brass male hose connector as used here:
More general views of the pump system - the recirculation and flow control worked well with the ball valves though, thanks again Aleman for the design and tips on its use

need more practice but certainly a sound and clever design
And here's the cooling system - food grade hose used as got it local and cheap and by the metre and means I *could* run water through the chillers and then warm water into HLT potentialy. Gnerally wanted strong, clear reinforced tube by the metre so why not!
Setup to allow the two chillers to run via the 3 way connector or use a simple connector to run just one chiller, can all be out of the way while boiling with burner on and using hooks to keep the lines up and well clear of the super heat below:
Wired in an electric socket with switches to control pump and elec blanket element in mash tun, the wire then goes in to the house via the air vent hole conveniently located next to brew shed so no need to have open windows or door anymore, thus making SWMBO happier. (Silicon hose just hanging there out of the way not used/wet!)
The whole brewery - with plenty of hooks (and a fire extinguisher) add to hang bits up on. Working... but not ready till further tested with cold then hot water and then all joints retightened and any remaining leak issues resolved.
Getting some paving slabs to replace the roof tiles via freegle - but weighing about 45kg each I do worry about structural integrity and unbalancing. Kind of hoping tiles will do the job but if anyone's looking and screaming NOOOOOO please post!
Final steps now (for tomorrow) are: bolting in heat shield for mash tun, bolting down false bottom into mash tun, full cold and then hot wet run and then checking ALL joints and resolving any remaining leaks. And putting a layer of mylar over the HLT camping mat jacket so that's as shiny as the mash tun. (The insulation on HLT is all removable - foam in the base and on the lid and a single layer of camping mat that slides over the outside so still usable as a boiler by its owner - aim was to add some insulation to keep liquor at temp for reasonable time after pumping from boiler rather than heating it direct or keeping it hot for hours and hours on end.