The time has come to upgrade my home brewery. I have a couple of friends who want to brew with me so I'm looking at going to 100 litres. My current brewery was built by myself out of a 20ish liter coolbox, a 60 litre fermenting vessel that I've placed kettle elements and a hop strainer inside. The 60l FV acts as a HLT and boiler. With that in mind I'm thinking of the following design:
100L HLT
80L Mash Tun
100L Boiler with false bottom
2 x pump
PID Temperature Controller
Control Panel
The pump 1 will sit between the boiler and mash tun to underlet it and re-circulate the mash
Pump 2 will sit between the HLT and boiler in order to pump the wort to the boiler.
The control panel will control the heating elements for both the HLT and Boiler along with the 2 pumps.
Would you mind critiquing the design for me? I've pasted below an outline of the set up that I have drawn up in Libre Office.

Thanks very much,
James
I plan to build a control panel to control the pumps, HLT and