I decided to build a kegerator about 12 months ago, and I finally finished it a few weeks back. The problem was that I had a standard sized undercounter larder fridge and I wanted to make it hold 4 corny kegs. It could only house 2.

After some deliberation I decided that changing for a chest freezer wouldn't work for me, as I would not be able to lift the kegs in (due to the fridge/freezer) being on the counter top. So the only option was to adapt.

So I took the top of the fridge off to see if it was feasible to get four kegs in my fridge

Image

In answer, it was but I would need to move the fridge door forwards and so needed to make some longer supports to hang the door from.

Top bracket
Image

Bottom bracket
Image

Because of the length of the brackets I made the lower one double thickness for extra support.

Next I made a wooden frame to screw onto the front of the fridge. Four blocks for support in in each corner, with thin plywood sides. This was to leave space for insulation later on. Corners yet to be finished off at this point.

Image

And then roughly fitted for a test run...
Image

Next I cut a hole in the top of the fridge and used a combination of Duct tape and left over window edging strips to tidy up the opening.

Image

And from above
Image

So the next job was to make a box to sit on the top of the fridge. This is so the 2 kegs on the compressor shelf could be covered and contained within the fridge.

Start of box
Image

A little further on
Image

Box fitted with thin strips of wood to provide a seal between the box and fridge top (draught proof tape to be stuck to this to give good air tight seal)

Top box painted and now insulated with 'left overs' from other DIY projects
Image

So here we continue...

Door extension painted and insulated
Image

Shelf to stand 2 kegs on the compressor shelf, just needs a lick of paint...
Image

Holes drilled through door, enodis taps just about long enough to fit through!
Image

Got the kegs back into the fridge....
Image

Beer lines hooked up
Image

Gas hooked up
Image

Temperature control hooked up
Image

Time to try it out... Cheers :cheers:
Image

The next step is to hook up a gas powered pump to the side of the fridge to quickly flush cleaner/sanitiser through the lines...

Definitely better for having temperature controlled beer :thumb: Now I need another project :D

User avatar
alexlark
Under the Table
Posts: 1403
Joined: Thu May 02, 2013 12:29 pm
Location: Rhondda, South Wales

Re: Kegerator Build Complete...

Post by alexlark » Sat Jul 11, 2015 11:09 am

Quirky solution, I like it! Can't fault a good DIY build and what better way to finish than with a beer :)

User avatar
Brewedout
Piss Artist
Posts: 246
Joined: Fri Aug 26, 2011 11:30 am

Re: Kegerator Build Complete...

Post by Brewedout » Sat Jul 11, 2015 12:47 pm

alexlark wrote:Quirky solution, I like it! Can't fault a good DIY build and what better way to finish than with a beer :)
Thanks, and quite true! It was an enjoyable experience, and quite satisfying to do it on off cuts and freebies. Minimal cost :)

Post Reply