Jay's The Electric Brewery Build - 220-240 UK Version
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Good to see your build - I'm making one myself! eBIAB
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Hi All, progress has been slow what with Christmas, work and 3 young children.... But I have been plugging away

I have made most of the required holes in the front of the control panel, I have included a hole for an extra PID incase I decide to go RIMS at a later date or if I decide on temperature controlled fermentation, just gives me more options and makes the panel more future proof:)

Jay


I have made most of the required holes in the front of the control panel, I have included a hole for an extra PID incase I decide to go RIMS at a later date or if I decide on temperature controlled fermentation, just gives me more options and makes the panel more future proof:)

Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Good idea. I wish I'd done thatJay7792 wrote: I have made most of the required holes in the front of the control panel, I have included a hole for an extra PID incase I decide to go RIMS at a later date or if I decide on temperature controlled fermentation, just gives me more options and makes the panel more future proof:)
- floydmeddler
- Telling everyone Your My Best Mate
- Posts: 4160
- Joined: Mon Feb 16, 2009 10:37 pm
- Location: Irish man living in Brighton
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Cheers mate, I'm trying to only build this thing once and make as future proof as possible, still need to add 1 or 2 more holes for adjustable element control then it's ready for paint:)Belter wrote:Good idea. I wish I'd done thatJay7792 wrote: I have made most of the required holes in the front of the control panel, I have included a hole for an extra PID incase I decide to go RIMS at a later date or if I decide on temperature controlled fermentation, just gives me more options and makes the panel more future proof:)
Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Hello mate, thanks very much:)floydmeddler wrote:Nice!
Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Hi All, abit more progress was made today:)

Here I have marked out the hole that is needed on top of the control panel for the heat sink.

After about 30 mins with the trusty Dremel the hole was cut:)
Just waiting now for my Tap and Die set to arrive so that I can attach the SSR's to the heat sink.
So all in all not a great deal of progress.... But progress none the less.
Jay

Here I have marked out the hole that is needed on top of the control panel for the heat sink.

After about 30 mins with the trusty Dremel the hole was cut:)
Just waiting now for my Tap and Die set to arrive so that I can attach the SSR's to the heat sink.
So all in all not a great deal of progress.... But progress none the less.
Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Here are the SSR's waiting to be attached to the heat sink:)

Hopefully my tap and die set will arrive tomorrow.
The rest of the Panel LEDS and siren have also arrived along with the Amp and Volt meters:)

The control panel selector switches also turned up

And last but by no means least, the Sestos Timer has also arrived:)

Jay

Hopefully my tap and die set will arrive tomorrow.
The rest of the Panel LEDS and siren have also arrived along with the Amp and Volt meters:)

The control panel selector switches also turned up

And last but by no means least, the Sestos Timer has also arrived:)

Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Jay
I'm fascinated by your project and aim to do something similar when I move house. Just a quick question, how do you plan to power it? Will you have a new dedicated consumer unit where it's all located or something else; RCD?
Cheers
Andy
I'm fascinated by your project and aim to do something similar when I move house. Just a quick question, how do you plan to power it? Will you have a new dedicated consumer unit where it's all located or something else; RCD?
Cheers
Andy
Re: Jay's The Electric Brewery Build - 220-240 UK Version
Hi, the last PID has been ordered along with all of the internal components that are needed, I just need to source 2 suitable door bell step down transformers and the safe start interlock:)
I have a weeks holiday next week so hopefully a lot of the parts will start to turn up soon!!
Jay
I have a weeks holiday next week so hopefully a lot of the parts will start to turn up soon!!
Jay
Re: Jay's The Electric Brewery Build - 220-240 UK Version
This is looking great - where did you get your 3 way switches from ? farnell ? Im currently looking to add some additional manual pump control to my electric brewery build.....